What the owner should have ready on the first call
A short list of documents and contacts lets the crew start the zone plan the same day.
- The name and number of the building manager or the person who can approve work on the site
- The floor plan, with the shut-off valves and the electrical panels marked
- The list of tenants and their occupancy hours, so that the work can be planned around them
- The commercial policy number and the name of the insurer or agent
- Any food, medical or safety requirements that govern the affected rooms
Splitting the building into zones
The zones are set to match the occupancy, not only the floor plan.
A zone is a part of the building that can be closed, dried and reopened without waiting for the rest. A wet kitchen is often a zone on its own, since its food rules are different from the dining room. An office suite with a shared corridor is split so that the corridor can stay open while the suite is dried.
The zone plan is drawn with the owner and shared before work begins. A zone that is changed after the drying starts is re-read, and its readings start again from the new boundary.
Working around the business
Noise, access and hours are planned in advance, so the business can trade where it is able.
Equipment is placed to keep customer routes clear, and cords are run along walls and under covers. Where the work is noisy, it is scheduled for hours when the business is closed, and the owner decides which hours those are. Access to the building is agreed in writing, including who holds keys and how the crew signs in.
A business that is trading in part of the building can keep doing so if the affected zone is closed behind a barrier and the air is kept from crossing into the open area. The owner decides with the crew which trade is possible and which must stop.
Records a property manager and an insurer will ask for
The file is kept daily, because the daily entries are what a dispute is decided on.
The file includes the readings for each zone, dated and placed on a sketch, the photographs of each zone before and after work, the list of materials removed and where they went, and the equipment log. Each entry is signed by the crew, and each handover is signed by the owner or manager.
An inventory of damaged stock and equipment, with the age and value the owner gives, is kept as a separate list. Its entries are the owner's to make, and the crew records only what it sees.
Reopening and what comes after
A zone reopens only after its final walk and its written handover.
The final walk for each zone checks the finish, the readings, the systems and the cleanliness of the room. Any open item is written down with an owner and a date. The source of the loss is repaired before the zone reopens, and the repair is recorded in the file.
A building with a repeated loss is reviewed with the owner after the reopening. The review covers the source, the maintenance schedule and whether a device or a plan would stop the next loss at the same point.
Some owners ask for the zone plan to be shared with every tenant at once, and others prefer a plan for each tenant's space. Either works, provided the boundaries and the reopening dates are written down and signed. A plan that changes after it is shared is re-issued with the change marked, so that no tenant works from an old copy of the zone map.
A short daily call between the crew lead and the building manager is the simplest way to keep the zone plan current. The call covers which zone was read, which equipment moved, what the manager needs to tell tenants and what is planned for the next day. Each call is noted in the file with its time, so the record shows when the owner knew each step.